Thursday, 14 July 2011

HBA installation progress — 14-Jul-2011

Despite some rough weather, today was one of our best days. We took delivery of a further two lorries-worth of tiles and managed to get six tiles installed on the field. Our frameset stock is also good, with four completed and ready to be deployed. The situation is now as follows:



This means we're two-thirds of the way through the tile installation. Still a long way to go, but so far so good.