Cable work in the RF-container

We now have installed all the patch cables in the RF-container. These are the 6-metre cables that go from the back of the patch-panel under the false floor and into the signal processing racks.

Under-floor cabling. (Photo. D. McKay-Bukowski)

Close-up of the back of the patch panel. (Photo: D. McKay-Bukowski)