Pages

Wednesday, 28 November 2012

The path to the mausoleum

Despite the service to the aerial, we were still having problems with RCU #84 (Aerial #42, X-polarisation). The next most likely source of the problem would be the cable join. This means opening up tyhe LBA mausoleum (where the excess lengths are located and the joins are placed).

The LBA mausoleum. (Photo: D. McKay-Bukowski)
Getting to the mausoleum is easy. However, opening it up was quite a challenge in the cold conditions.

No comments:

Post a Comment

Note: only a member of this blog may post a comment.