Pages
(Move to ...)
Blog
About
Specs
Data
Status
Achievements
Radars
Reference
▼
Showing posts with label
transport
.
Show all posts
Showing posts with label
transport
.
Show all posts
Thursday, 28 November 2013
Mountain crossing
›
Yesterday we drove up to EISCAT for a meeting on phase coding, and to take one of the crew up to EISCAT for the remaining experiment. We dro...
Monday, 3 June 2013
Grids leaving the site
›
As we reported Sunday, the remaining LBA grids have been packed for transport from the KAIRA site back to Sodanklyä Geophysical Observatory....
Sunday, 2 June 2013
Moving the spare LBA grids
›
As we reported last year, there was spare parts left over from the construction of the LOFAR LBA (Low-Band Array) field. This was because we...
Monday, 9 May 2011
Loading the vehicles
›
This is going to be a busy week. Today we will set off from Sodankylä Geophysical Observatory for the first full expedition this season to...
Sunday, 17 October 2010
Frames to go!
›
In order to limit the amount of drift snow that banks up on or against the antennas, the KAIRA project plans to put the high-frequency tiles...
›
Home
View web version