Thursday, 28 November 2013

Mountain crossing

Yesterday we drove up to EISCAT for a meeting on phase coding, and to take one of the crew up to EISCAT for the remaining experiment. We drove up during the day in pretty poor conditions and returned in the mid-afternoon. Of course, that means pitch darkness at this time of year.

The mountain pass, which had been a bit wet earlier was by now pretty treacherous and there were no fewer than three stuck lorries that needed to be passed along the way. In the example shown, the lorry managed to get part way up the incline, lost traction and then slid back down until it jack-knifed against the snow bank.

Jack-knifed lorry on the E8 between Skibotn and Kilpisjärvi.

A recovery vehicle came over from Finland to rescue it. However, having proceeded further it then came to a stop again, due to the fact that some of the recovery gear had been left behind. As we had the only car on the road, we returned to assist. In remote locations and difficult situations, everyone pitches in to help out.

So, yes, it was a slow and eventful trip back to Kilpisjärvi.

Monday, 3 June 2013

Grids leaving the site

As we reported Sunday, the remaining LBA grids have been packed for transport from the KAIRA site back to Sodanklyä Geophysical Observatory. A total of 4 packs of grids were made. These were picked up by a forestry lorry (the sort used for moving logs) last Friday.

The packed grids are loaded between the tines. (Photo: D. McKay-Bukowski)

The crane at the back looked quite spindly... a bit like a  giant insect. Yet it had no trouble putting the grids in place.

The last one is placed. They were then tied down and got on their way. (Photo: D. McKay-Bukowski)

They were then taken from the site... which is looking pretty smart now. Nearly all the construction material have been cleared away and the grounds are clear from stockpiles. We're nearly ready for the official opening and site inspection on Thursday!

Sunday, 2 June 2013

Moving the spare LBA grids

As we reported last year, there was spare parts left over from the construction of the LOFAR LBA (Low-Band Array) field. This was because we have opted to build a second LBA site, rather than a split field system as was originally envisaged. As a result we need to move the remaining LBA grids from the KAIRA site and back to the institute at Sodankyla.

As the grids are wider than conventionally permitted on Finnish roads, they were packed into timber frames for vertical transport. Today's photographs show the packing arrangement that we used.

Timber frames bolt together to hold about 10 grids. (Photo: D. McKay-Bukowski)

Packs of grids ready for transport. (Photo: D. McKay-Bukowski)

Monday, 9 May 2011

Loading the vehicles

This is going to be a busy week. Today we will set off from Sodankylä Geophysical Observatory for the first full expedition this season to the KAIRA site — the home of LOFAR station FI609.

The pre-trip briefing meeting has now been held, as well as various follow-up discussions and we're now at the 'final-packing stage'.

The van is mostly loaded and all that remains now, is to secure the tooling and shoring timber on the trailer before hitching it up, having some lunch, then setting off. As you can see, there is still a bit of snow piled up, but the ground is mostly clear now. It will be interesting to see what it is like this evening when we reach the KAIRA site... which is over 1½ degrees further north and at higher altitude.

If you are new to this web log (welcome!), then you've picked a great week to start following us. Over the course of the next few days, we will be doing the final site evaluation, dismantling the test tiles, starting ground preparation work and doing some destructive testing.

A description of KAIRA can be found on our project page (also available in Finnish language).

Sunday, 17 October 2010

Frames to go!

In order to limit the amount of drift snow that banks up on or against the antennas, the KAIRA project plans to put the high-frequency tiles on a raised platform, made from a series of frames. By raising the tiles, they will be subjected to greater wind speeds and will avoid the immediate ground boundary layer.

To test this, and various other concepts, two test tiles will be deployed at the site this year. They will be monitored over the winter and fully inspected in the spring. Of the two tiles, one will be placed on a 1-metre high platform and the other directly to the ground (like is done at conventional LOFAR sites).

The deployment of these test tiles will be carried out over the next couple of days. And, although the tiles themselves will be delivered directly to the site, the frames will be taken up from the institute.

In this photograph, the set of timber frames has just been loaded onto the trailer, ready to be towed up to the site.