Re-surveying the LBA

As part of the summer maintenance, we surveyed the LBA heights. One of the concerns was that the freeze/thaw cycle in the soil and gravel that supports the LBA would cause subsidence or a minor 'palsen' effect which in turn would distort the array field.

To carry out this test, we used a laser level and investigated the relative heights of the different aerials. This task was carried out by some of our summer workers.

Conducting the LBA survey with the laser level is in the foreground. (Photo: D. McKay-Bukowski)

Sunday, 8 July 2012

LBA field levelled and surveyed

The Low-Band Antenna array field has now been levelled. The next stage is then to mark out the location of the aerials. The aerials are scattered about in a 40-metre diameter circle. The scatter pattern is not random, even though it looks like it. The reason for this pattern is to improve the beam-shape of the sparse array. By spreading out the aerials, you can increase the resolution, but you need to do so carefully to avoid aliasing effects (called side- or grating-lobes) from becoming problematic.

The layout that we are using is modelled closely on that of the inner configuration of a Dutch Remote Station ("RS"). The two outlier antennas are brought into the array and two additional calibration aerials will be installed later. Although it looks like some of the aerials overlap, it is actually on the ground planes that intersect. The aerials themselves at the array centre are close-packed but do not physically interfere with each other.

Design of the KAIRA LBA layout. (D. McKay-Bukowski & J. Vierinen).

Each position has two survey pegs. The first at the northern edge of the aerial ground plane defines the position. The second constrains the rotation. We'll discuss this in a later web log post.

One of the survey pegs on the LBA field. Photograph by Arttu Jutila.

These survey positions were provided to a survey company who completed the layout of the pegs.

Marking the GPS points was finished rather quickly thanks to the GPS specialist.
This is a view of the LBA field taken on top of a HBA tile. Photograph by Arttu Jutila.

The next stage on the LBA construction is the installation of the cable trenching and ducts. However, there is also a lot of HBA work about to start up. Keeping up with the web log is always a major challenge over the busy Arctic summer build season. But there's lots to follow so do make sure you visit regularly and keep up to date with the progress.

Saturday, 7 July 2012

More photographs from the levelling of the LBA field

More scenes from the levelling of the LBA field. All photographs by Joona Keskitalo




Thursday, 5 July 2012

LBA field nearly level

Here's another photograph of the LBA field. It is now almost level and we are getting close to doing the surveying work to peg out the locations of the individual LBA aerials.

Part of the nearly-levelled LBA field. The orange post at the centre-right of
the photograph is the actual LBA field centre. Photograph by Toivo Iinatti.
Note that even at the end of June (when this photograph was taken), there was still a bit of snow on the upper parts of the hills.

Sunday, 1 July 2012

LBA field levelling begins

On 20th June 2012, work began on levelling the LBA field. This work will take about a week to complete.

Initial placement of levelling material. Photo: Toivo Iinatti.

Tuesday, 19 July 2011

Level playing field

Although the field has been pretty good overall, there have been a few times where loose stones or the pressure of the HIAB lorry have caused some minor raising of the field level. This has then been corrected by hand.


Here, Johannes Turenen fixes a slightly high patch in the space between the lorry wheel tracks. The frame itself is propped up on blocks of wood to give a small space from which the loose rock can be cleared away.

Friday, 24 June 2011

The mound

After all the work that the contractors have done, it is impressive to see how the edge of the mound has been built up to level the array field. This photograph was taken looking northwards across the west corner.


Photo: D. McKay-Bukowski

Thursday, 23 June 2011

Lorry loads

How many times has the gravel lorry visited the site?

I, for one, have certainly lost count.

Not far from the KAIRA site, there is a gravel pit, which we have been using to supply the HBA field with graded gravels, to provide a drainage layer and then a raised platform on which we can build.

Our original estimate was 912 cubic metres of gravel, but I've been informed that we've exceeded that now... not for the array alone, but for the surrounding works that have required attention due to unsuitable terrain or geo-conditions.



Of course, the main array itself is now complete, so these new loads that are coming in are for the storage, loading and turning areas at the southeast end of the array. These are essential for the building of the system and will also be used as a general staging area for the servicing of the antennas during the longer term operations phase.

After each load comes in, the lorry will dump it out on to the field, from where it can be scraped about by the 18-tonne digger. Although the laser level was used for the HBA itself, the access area can be done according to the local terrain. It still looks pretty flat though.

This is shaping up really well. One of the issues encountered at other site is one of access and delivery. This not going to be a problem at KAIRA!

Saturday, 18 June 2011

Drain pipes — Part 1

Once the ground has been raised to the next level, the crew can install the draining pipe. This agricultural drain, is about 10cm in diameter. However, unlike normal pipe, it has holes in it so that the water can seem in, and then flow away.


Instead of putting it in up front (which hinders the movement of the digger), we are instead installing it afterwards by digging a trench, placing the pipe and filling it back in.



Each drain pipe crosses the entire HBA array and deposits its water off the southwest face of the mound.



Photos: D. McKay-Bukowski

Friday, 17 June 2011

Level surface

Here's a close-up photograph of the levelled gravel surface. It is very smooth and flat, but is easily disturbed at the moment by wheeled vehicles.

Remarkably, the digger can manoeuvre on it without too much disruption.

Once this gravel has been placed, then work can start on the installation of the special water drains.

Photo: D. McKay-Bukowski

Thursday, 16 June 2011

Levelling the gravel

As mentioned earlier, we use a laser level to work out the correct height to which each stage of the area is levelled.


The digger operator then works to this to ensure that the field meets the specifications.


Photos: D. McKay-Bukowski

Thursday, 9 June 2011

Laser level

Before the antennas can be deployed, the entire site needs to be levelled first. This includes not just the array area, but also the nearby access points and the region which we have set aside for storage of the HBA tiles that will be delivered soon.

In order to get the level just right, a laser levelling system is used. A rotating mirror and laser project a beam that is perfectly level across the entire site. A staff (with audible feedback unit) is moved to different locations so the contractors can work out how much material needs to be shifted by the 18-tonne digger.


The staff with optical detector (the blue gadget with black connector) can be seen in the photograph, alongside the larger blue unit, which contains the rotating laser. The digger is in the background.

The stone that the equipment is resting on is just one of the boulders that has been dug out of the site so far. There's actually a lot of material like this, but the digger can get it out without too much trouble.