LBA Topographic Survey

The coarse grained topographic survey of the LBA field was conducted
using a laser level and laser distance finder. First 10 posts were
marked on the corner points and on the center of the field. The
distances between these posts were measured using a laser distance
finder. Several distances were also cross-checked with a tape
measure. The LBA field center point, one of the corner points, and a
reference point were also measured using a Sokkia precision GPS
device. The accuracy of the measured distances between the posts was
estimated to be +/- 10 cm. The accuracy of the GPS measurements has
not yet been estimated, but by comparison with tape measure distances,
it is expected to be approximately +/- 5 cm in longitude and latitude,
but significantly higher in altitude.

In addition to the 10 posts, we added a post that marks the
approximate location of the LBA field centerpoint, as the previous
center post was too close to the reindeer fence on the outer perimeter
of the KAIRA site. This was then measured using a precision GPS with a 1
hour integration time.

The local coordinates of the posts were then determined using
triangulation. We then used a string with 10 m marks to measure the
variation of ground level at approximately 10 m intervals on the
baselines between the edge posts. The measurement points are shown in the figure below.


Based on these results, the difference between the highest and lowest
point is approximately 220 cm. The ground is fairly even over the
whole field, and the altitude drop occurs evenly over the whole
field, with a slightly steeper descent approximately half-way down the
field. The topographic map of the LBA field is shown in the figure below.



Based on several test hole that were dug in the ground, the surface
layer of organic material is 5-20 cm thick. Underneat this, is a layer
of wet silt. This is a non-Newtonian fluid (very similar to a mixture
of corn starch and water), which is hard when forced, but liquid when
gentle pressure is applied. When dried up, the material is
powder-like and easilily blown away by the wind. It is difficult to
estimate what impact this has in terms of ground movement due to
permafrost, but most likely this is not a very stable soil-type.

Thursday, 18 August 2011

Cable barcodes

At the end of each signal cable, there is a barcoded label. This applies to the patch cables, the cables in the tiles and the long signal cables that go from the tiles back to the RF-container.



Each cable within the system is carefully manufactured and the serial number on the cable contains information about its performance and role. For example, the one in the middle of this photograph (CHY-1154654-2204090013) is an 'C'able from the 'H'igh-Band Array, 'Y'-polarisation. It is '115' metres long and has a delay of '4654' tenths of a nanosecond. This means that, in laboratory conditions, it takes 465.4 nanoseconds for a signal to travel down this cable.

What then follows is the date of manufacture (220409 = 22 April 2009) and the cable ID for that day (this one was number 13 for that day).

All of this information can be scanned quickly with a barcode scanner. This then forms part of the site inventory, which means it is very easy to find certain parts in the event of a fault.

Also, in order to make visual recognition easier, certain labels will be colour coded. For the array cables (of which the ones in the photograph are examples), the white labels are for the Y-polarisation and the orange labels are for the X-polarisation. This is why we colour coded the progress reports with orange and white!

Wednesday, 17 August 2011

LBA centre

At the conclusion of the LBA survey work (carried out by Mikko Orispää and Juha Vierinen), a centre mark was driven deep into the ground. This is the centre point of the entire LBA array and the mark on the top has been measured accurately to be sent to ASTRON for them to calculate the coordinate locations for the individual antenna elements.


The taller, thinner post to the side of the centre mark is just a snow pole. It should (just) be visible over the snow allowing us to find the mark in winter if required.

Photo: D. McKay-Bukowski

Tuesday, 16 August 2011

Cable mausoleum

Another photograph of the work being done on the cable mausoleum. This is the structure where the surplus cable length is zig-zagged back and forth before going into the RF-container.

Here, Pertti Nissinen (left) and Rauno Oikarainen fit the support timbers for the next level of the mausoleum. The white pipes are the ducts that go into the RF-container.

Monday, 15 August 2011

LBA survey work

Although not due until next year, the survey for the LBA (Low-Band Array) was carried out at the beginning of the month.

Juha Vierinen (far distance) and Mikko Orispää doing the survey work.

Juha Vierinen at the end of the day's work.


It's amazing to think that it is less than a year since Markku Postila and I did the same work for the HBA. That seems like an eternity ago!

Sunday, 14 August 2011

Trimming

With the cabling finished, there were just a few minor adjustments to be made to the woodwork.


Here, Pertti Nissinen trims a beam to allow the final cable dressing to be done neatly.

Saturday, 13 August 2011

Frog

This little frog was spotted on the LBA field at the beginning of the month, at about the time we were doing the LBA field survey.


It is amazing that these creatures survive the long Arctic winter, but one of the scientists at the Biological Research Station explained that they hibernate in the mud at the bottom of the lakes. Although the lake surfaces freeze to a thickness of over a metre, the lake bottom remains liquid thus permitting fish, frogs and other creatures to endure the harsh winter.

Photo: D. McKay-Bukowski