![]() |
| The KAIRA site (Photo: D. McKay-Bukowski) |
Friday, 29 August 2014
Typical KAIRA
Today's photo has a bit of everything. The LOFAR HBA tiles, the LBA array in the background, Saana dominating the horizon, the storage containers and site area, and our trusty observatory vehicle.
Thursday, 28 August 2014
Valhalla
Always curious to try local produce, I tried this herb liqueur by Koskenkorva. It comes in a matt black bottle, rates at 35% and is ominously titled: "Valhalla".
Herb ingredients are: Angelica achangelica, Artemisia absinthium, Achillea millefoium, and Glycyrrhiza glabra.
Herb ingredients are: Angelica achangelica, Artemisia absinthium, Achillea millefoium, and Glycyrrhiza glabra.
Wednesday, 27 August 2014
Roadworks
Driving back late one night from KAIRA to SGO there was (yet another) hold up. This time roadworks. In fact there is a bridge under repair on the route from Kittila to Sodankylä and this is where we got stuck.
We were the only car.
And yet the delay was... well...
We were the only car.
And yet the delay was... well...
Plasma lines at Arecibo
![]() |
| 25 MHz wide plasma line profile at Arecibo, 2.5 seconds of integration. |
Anyway, this is quite a successful first try. The IF will need to be at a different frequency than 260 (e.g., 264 would be nice), as plasma line below 10 MHz folds, and can also be seen "sliding" down from +12.5 MHz too. Another option is to bring a tuner to shift the band to a lower IF. Also, the wide band IF doesn't seem to be wide enough. The upshifted line isn't that visible due to filter roll-off.
Monday, 25 August 2014
Data extraction
There are numerous computers in the RF-container, which handle data processing, control and storage. One of these has now been taken out and has been moved back to SGO for use there in some of our interferometric riometry development work. During the extraction of this data system, we had the side cover of the RF-container signal processing racks off, thus once can see the other computers, network gear, etc.
![]() |
| KAIRA data systems (Photo: D. McKay-Bukowski) |
Sunday, 24 August 2014
Missing in action
Today's photograph shows the frameset of HBA tile #75. Or, we should say... the former HBA tile #75. It is missing due to a severe blizzard that swept through the site at the beginning of the year. We are still waiting for a quote from ASTRON to get this replaced.
![]() |
| Frameset for HBA tile #75 (D. McKay-Bukowski) |
Saturday, 23 August 2014
A big blade
heading back from KAIRA to SGO the other morning, I was held up for a considerable period of time at the turn to Meltaus. The reason for this was that a convoy was moving three huge blades of a wind turbine and the first of these was starting to make the turn just as I arrived at that point.
It was quite a long wait as the turn was very difficult given the huge length of the blades. I tried to estimate the length and I suspect they are 40-50 metres long each.
Information about the project can be found here: http://www.laatumaa.fi/tuulivoima/joukhaisselka-sodankyla/
It was quite a long wait as the turn was very difficult given the huge length of the blades. I tried to estimate the length and I suspect they are 40-50 metres long each.
![]() |
| Turning wind turbine blades. (Photo: D. McKay-Bukowski) |
Information about the project can be found here: http://www.laatumaa.fi/tuulivoima/joukhaisselka-sodankyla/
Subscribe to:
Posts (Atom)






