This past week, a team from KAIRA/SGO, LTU and EISCAT have been installing a digital beamforming system on the
Kiruna Demonstrator Array. Today, we feature some of the photographs from the installation of the field equipment.
|
Tomi brings out more USRP subracks. (Photo: D. McKay-Bukowski) |
|
Johan installing the LTU receiver system. (Photo: D. McKay-Bukowski) |
|
Lars-Göran runs the cables back into the main building. (Photo: D. McKay-Bukowski) |
No comments:
Post a Comment
Note: only a member of this blog may post a comment.