Going the other way, the 40m cables are run from the aerial back to the node and then from there to the mausoleum. This is because the new metal armours are two large to easily get through the thin antenna ducts.

Fitting the draw clip to the cable pair. (Photo: D. McKay-Bukowski)

Drawing the cables through to the node. (Photo: D. McKay-Bukowski)

By now the cables have nearly reached the mausoleum (left far distance). Note the metal armour near the left. This was fed on from the leading end and will eventually end up at the base of the post. (Photo: D. McKay-Bukowski)