Well, as reported, the jänis had struck twice and that meant lots of repair work for us. Actually in total there were 14 x LBA aerials to fix.

Status on 27-Aig-2014

The storm damaged ones were the most work. There required fitting new connectors (the old ones had been ripped clean off during the impacts). The jänis-attacked LBAs were more numerous, but less time consuming.

Repaired LBA line (Photo: D. McKay-Bukowski)

The fix was adding a new length of nylon guy line. A double-fisherman's bend is used to join the new section of line to the old and a bowline is used to make the loop to hook over the peg.

To discourage the jänis from simply biting through these again, we smeared the lines with a combination of spray lubricant and grease. This is waterproof and should give a bad smell and texture, thus deterring further jänis attacks.

However, in the long-term, we'll still need to work out a better way of protecting the LBA aerial lines.