With the cables checked and the mausoleum complete, it was time to try running through the first 115m cable pair. This would go from the RF-container, through all the ducts and out to antenna tile location HXX (far western corner).
We got the cable through the RF-container ducts, and then the first stretch from the mausoleum to the 'corner' before heading up to the array. However, the final stretch to the array was somehow blocked. We worked at it for a bit before recovering a loose piece of geotextile that was blocking the tube. However, the cable-pair still refused to go through.
The draw string was working, and some checks with rope were also working. However using the 'lemming' didn't. The 'lemming' is our nickname for an improvised test canister. It is attached to the draw-string loops and can be used to check that a cable duct is clear. The name is from the fact that a lemming is what would be best able to check on the duct situation. And this is the closest we can approximate to a lemming!
Well, it turned out that we had a serious blockage. We suspected that there might be a problem with one of the frameset anchors having pierced the duct pipe. However, a test excavation indicated that this was not the case. What we did find, however, was some seriously crimped pipework! As a result, we checked all the ducts and realised that there was just one stretch where two of the four pipes were blocked. So we excavated the entire area.
Sure enough, this is what we found.
These crimped pipes are probably due to extreme ground pressure during the movement of vehicles overhead.
Well, we have no choice by the re-work the trench and put down new pipe.
Showing posts with label geotextile. Show all posts
Showing posts with label geotextile. Show all posts
Thursday, 28 July 2011
Wednesday, 6 July 2011
Geotextile
Along the edges of every tile in a LOFAR high-band array, there are long stretches of fabric, known as geotextile. This material serves two purposes: weed suppression and protection against erosion.
Although the array looks pretty solid, there is actually a small gap between the tiles of the HBA. The tiles are 5000mm, but the spacing of them is 5148mm (that is, and 148 millimetre gap). Normally the HBA tiles are deployed on the ground, so getting to the space between them is quite difficult. And, with wind-blown seed, it would be easy for weeds to grow out of control in the gap between the tiles.
For KAIRA, this is not so much of a problem. Firstly, the entire array will be built up 1.5 metres above the ground on the framesets. This means that weeds will struggle to get as high as the tiles themselves (don't forget that vegetation is quite stunted in the Arctic). Secondly, the framesets make it easy to get underneath and deal with the weeds. Still, the fabric will not hurt and it will certainly help suppress weeds around the anchor points.
However, the other reason — protection again erosion — is more important for KAIRA than for other LOFAR sites.
This is because there is a lot of water at the beginning of summer, when warm weather and rain combine with melting snow to create a lot of liquid water. This runs off the tiles and falls down the gaps. However, unlike a conventional LOFAR station, the raised tiles means that this water is falling not 0.5 metres, but 2 metres.
The geotextile is deployed from a large roll that is wheeled out onto the field. It is drawn out and cut to length to match the section being completed. Then, small slits are made, and the fabric is placed over the survey pegs. The edges are nailed into the soil to hold it temporarily while waiting for the framesets to be deployed and the anchor lines drilled in and attached.
A second length of fabric goes cross-ways to complete the lattice. This also neatly defines the squares which, although not critical, certainly make life a little easier to work out what goes where and to avoid accidentally kicking the survey pegs.
Photos: D. McKay-Bukowski
Although the array looks pretty solid, there is actually a small gap between the tiles of the HBA. The tiles are 5000mm, but the spacing of them is 5148mm (that is, and 148 millimetre gap). Normally the HBA tiles are deployed on the ground, so getting to the space between them is quite difficult. And, with wind-blown seed, it would be easy for weeds to grow out of control in the gap between the tiles.
For KAIRA, this is not so much of a problem. Firstly, the entire array will be built up 1.5 metres above the ground on the framesets. This means that weeds will struggle to get as high as the tiles themselves (don't forget that vegetation is quite stunted in the Arctic). Secondly, the framesets make it easy to get underneath and deal with the weeds. Still, the fabric will not hurt and it will certainly help suppress weeds around the anchor points.
However, the other reason — protection again erosion — is more important for KAIRA than for other LOFAR sites.
This is because there is a lot of water at the beginning of summer, when warm weather and rain combine with melting snow to create a lot of liquid water. This runs off the tiles and falls down the gaps. However, unlike a conventional LOFAR station, the raised tiles means that this water is falling not 0.5 metres, but 2 metres.
The geotextile is deployed from a large roll that is wheeled out onto the field. It is drawn out and cut to length to match the section being completed. Then, small slits are made, and the fabric is placed over the survey pegs. The edges are nailed into the soil to hold it temporarily while waiting for the framesets to be deployed and the anchor lines drilled in and attached.
A second length of fabric goes cross-ways to complete the lattice. This also neatly defines the squares which, although not critical, certainly make life a little easier to work out what goes where and to avoid accidentally kicking the survey pegs.
Photos: D. McKay-Bukowski