Monday, 29 October 2012

Winter welcome

Well, in the past few weeks Winter has been arriving. In fact, things are moving faster than we can keep up with this web log (... so much to do!). In any case, here are some of the first Winter scenes from Sodankylä Geophysical Observatory for the season.

View from the EISCAT building. (Photo: D. McKay-Bukowski)

A wintry scene along the road through Tähtelä. (Photo: D. McKay-Bukowski)

Sunday, 28 October 2012

Observing tips #3 — Starting/stopping KBT experiments

KBT (KAIRA Background Task) as an observing system for scheduling and running pre-designed scripts. The following is the instruction set for getting KBT observations started.

Starting KBT observations
  1.  Be organised and log in to KAIRA01 at least 30 mins in advance, thus checking that you have a password, etc.
  2. When you have been allocated the telescope, you will receive an e-mail from someone (usually the previous observer). 
  3. When you get the "it's all yours now" e-mail, log in to the LCU.
  4. Double check the system is reset and ready to use. To do this, type:

    %  swlevel

    You should see "Currently set level is 0" and all processes are down. If not, get help.
  5. Check the current experiment with kbt.

    %  kbt --status

    It should be STOPPED. If not, get help.
  6. Change the experiment to yours.

    % kbt --list
    % kbt --experiment=rio3_v45z

  7. Start the experiment

    % kbt --start

    Your experiment is now starting. Note that it takes 2 minutes to fully start. Eventually, you will get your prompt back.
  8. Your experiment is now running. You should check that it is recording data files. First, use kbt to find where the data is going:

    % kbt --variables

    Look for "datapath".
  9. Use "ls" to inspect the datapath and check that the data is being recorded.If all is going well, there is no need to give the system further attention until the observations are over.
Stopping KBT observations

  1. Stop your observations with KBT.

    %  kbt --stop

    Note that this might take a little while.
  2. Double check that the system is reset and ready to use for the next observer. To do this, type:

    %  swlevel

    You should see "Currently set level is 0" and all processes are down. If not, get help.
  3. Then, and this is VERY IMPORTANT, send an e-mail to the next observer with a CC to lofar-obs to inform the observing team that you are finished.
That's it! You should now consider exporting your data.

Friday, 26 October 2012

Arctic skies

Just a nice image to finish the week. Enjoy...

The Arctic sky, looking southwest past the KAIRA HBA array. Photo: D. McKay-Bukowski.

Thursday, 25 October 2012

Freezing over

We took these photographs are the Sodankylä Geophysical Observatory recently. With theonset of the Autumn, the temperatures are dropping rapidly and winter will soon be upon us. And, of course, the water in the area is starting to freeze over.

First crystals forming in the puddles. (Image: D. McKay-Bukowski)

The Kitinen River starting to freeze over. (Image: D. McKay-Bukowski)

Tuesday, 23 October 2012

VHF upgrade at SGO — Part 3

And finally, the new receiver is installed on the 32 m antenna.

The new prime-focus, VHF feed. (Photo: D. McKay-Bukowski)

VHF upgrade at SGO — Part 2

Today work started on replacing the sub-reflector with a VHF prime-focus feed.
The crane (right) prepares to suspend the old sub-reflector, while the mobile platform allows the workers to get in close. (Image: D. McKay-Bukowski)

Monday, 22 October 2012

VHF upgrade for the EISCAT antenna at SGO

Due to the encroachment of radio-frequency interference (RFI) it was decided to convert the two EISCAT remote stations to operate at VHF frequencies. This is great news for KAIRA as it gives us some long baselines at the common frequency. Of course we've mentioned Sodankylä before; this is where the host institute is located.


At SGO, there is a 32m antenna (which used to have a UHF receiver). This is now being converted to a VHF system. The new receiver and feed can be seen in the lower left of the photograph.


The final image shows a close-up shot of the new system. It will replace the sub-reflector addionally converting the dish to a primary feed. Here, it is still on the trailer as it was brought over from Kiruna, Sweden.


The conversion is due to take place on 23rd October 2012. (Images: D. McKay-Bukowski)