Thursday 11 August 2011

Grounded

The second ground connection has been made on the electrical supply to the site. This was done at the beginning of the month, prior to the connection of the main electrical connection.

Although we have had mains power on the site for some time, the high-capacity circuit to the RF-container had not yet been made.

Additional works and checks need to be carried out before that can be done.

No comments:

Post a Comment

Note: only a member of this blog may post a comment.