Monday 1 August 2011

HBA cabling progress — 01-Aug-2011

August already?! Actually, the leaves have started turning yellow — we saw the first few some days ago now, and there has been a light dusting of snow on the fells the weekend before last. Today, we pressed on with the cabling and managed to reach the half way point. However, it has been tough going, with the ducts starting to fill up and becoming difficult to manage. But the two small sections of the KAIRA HBA have been cabled.



In addition to the cabling, we've started looking at the LBA field and preparing for an initial survey. We've re-labelled the patch panel in preparation for the RF-installation work. And, we've solved the mystery of the missing sand!

More on all of these stories soon.