Putting the metal ground planes in place. (Photo: D. McKay-Bukowski) |
Hammering in the anchor pegs. (Photo: D. McKay-Bukowski) |
The engineer from ASTRON shows the team how to fit new cable connectors. (Photo: D. McKay-Bukowski) |
The LBA Cable-Mausoleum, where surplus LBA cable is zig-zagged. (Photo: D. McKay-Bukowski) |
Feeding new draw-lines on the main cable ducts. (Photo: D. McKay-Bukowski) |
No comments:
Post a Comment
Note: only a member of this blog may post a comment.