Saturday 14 July 2012

LBA installation progress — 12-Jul-2012

On 12th July 2012, we installed our first low-band aerial. Although we have installed several around the sites before (three at Kilpisjärvi and two at Sodankylä), this one is different. The reason for this is that it is the first LBA to be installed in the "final" location on the field. In other words, we have started installation for real!

As you may remember from last year, we reported on the installation work of the HBA tiles. Well, as we have a lot of curious colleagues, we intend to do the same with the LBA as well. As a result, we will be putting up progress maps as we go along, showing the newly installed aerials. Although a bit empty at the moment, here is the first of them!


As we go along, we'll be interspersing these progress maps with photographs of the build. Enjoy!