Thursday 19 July 2012

LBA installation progress — 19-Jul-2012

It was a slow day today. The rain varied between light drizzle and heavy rain. As a result, the crew concentrated on other tasks. These included completing the fence by the site entrance, checking on HBA tile water drains, and a variety of necessary trenching works. In addition to this we got a lot accomplished in terms of software configuration and development.



Still, we got one LBA aerial installed (#L31, in the lighter shade in the diagram). Hopefully the weather will improve soon so we can make some more progress soon.

No comments:

Post a Comment

Note: only a member of this blog may post a comment.