When the frames were delivered to the site, it was not possible to put them in the optimal storage location, due to the rugged terrain on the field. Well, now that the first stage of the levelling has been completed, it has been possible at last to move them into the ideal location ready for their use in the main build.
Thus, on 8th June, we moved all 350 frames and the stored test tile across the site to a newly prepared area.
Photos: D. McKay-Bukowski