Friday 10 June 2011

Moving frames of reference

When the frames were delivered to the site, it was not possible to put them in the optimal storage location, due to the rugged terrain on the field. Well, now that the first stage of the levelling has been completed, it has been possible at last to move them into the ideal location ready for their use in the main build.

Thus, on 8th June, we moved all 350 frames and the stored test tile across the site to a newly prepared area.

The 15-tonne digger prepares to lift one of the frame stacks.


It is then driven across the HBA field to the other side.


And finally set down in the new stack position.

Photos: D. McKay-Bukowski

No comments:

Post a Comment

Note: only a member of this blog may post a comment.