Tuesday, 19 July 2011

Level playing field

Although the field has been pretty good overall, there have been a few times where loose stones or the pressure of the HIAB lorry have caused some minor raising of the field level. This has then been corrected by hand.


Here, Johannes Turenen fixes a slightly high patch in the space between the lorry wheel tracks. The frame itself is propped up on blocks of wood to give a small space from which the loose rock can be cleared away.

No comments:

Post a Comment

Note: only a member of this blog may post a comment.